SUSTAINABILITY

Shaping the Future with Sustainable Solutions.

Our Certifications & Initiatives

Certified for excellence in engineering, sustainability, and innovation.

MEP 2040
US Green Building Council
LA County Consumer & Business Affairs
M Logo
Southern California Logo
LAWA
DGS
DOT
Welcome-To-Budlong.

Our Expertise in LEED Certified Projects.

Budlong is strongly committed to sustainable development. Our designers have been applying California Title 24 energy code and California Energy Commission requirements since the beginning of those requirements in the 1970s. Budlong has LEED APs on staff, and we have provided professional services on LEED projects. Our staff receives ongoing training in implementing energy codes and we provide strong encouragement for additional designers to become LEED APs.
Frame 2338

Leading the Way in
LEED, CHPS & Net Zero Design.

Sustainable designs that prioritize energy efficiency, environmental responsibility, and long-term performance.

LEED Certified Projects

Icons 3
California Community Foundation, Los Angeles, CA
Icons 3

Cal Lutheran University Swenson Building, Thousand Oaks, CA

Icons 3

Miramar Housing, Los Angeles, CA

Icons 3

Los Angeles County Department of Parks & Recreation, Greater Whittier Regional Aquatic Center, Whittier, CA (LEED GOLD)

Icons 3

1808 St. Andrews, Los Angeles, CA

Icons 3

LAUSD Jordan High School Redevelopment (CHPS & LEED CERTIFIED)

Icons 3

Thousand Oaks Community Transportation Center, Thousand Oaks, California (First Ventura County Municipal LEED project,
LEED Silver Rating)

Net Zero Projects

Icons 3

Oxnard School District Juarez Elementary School

Icons 3

Oxnard School District Revere Elementary School

Icons 3

City of Los Angeles Slauson Connect Recreation Center

image 1 2

Innovative Designs
for CHPS Schools.

We have participated in seminars leading up to CHPS (Collaborative for High-Performance Schools) criteria and then have designed schools based on CHPS criteria. As a part of reaching CHPS qualification, we have provided designs exceeding Title 24 energy requirements by 15%.

Icons 3

LAUSD – Gratts Primary Care Center and Early Education, new school in downtown Los Angeles

Icons 3

LAUSD – Central Region Elementary School No. 14, new school in Los Angeles

Icons 3

LAUSD – Central Region Middle School No. 5 Design services provided for new school, approximately 85,000 Sq.Ft.

Icons 3
LAUSD – Central Region High School No. 15 Design services provided for new school, approximately 150,000 Sq. Ft.
Icons 3

LBUSD – Newcomb Middle School, new middle school.

Icons 3

Brightstar Schools New Rise Kohyang High School, new 67,000 Sq.Ft high school.

Icons 3

Brightstar Schools New Rise Kohyang Middle School, new 69,000 Sq.Ft – 90,000 Sq.Ft middle school with 21 classrooms.

image 19
image 20
Frame 2339

Net-Zero & WELL Building
for Sustainable Design.

Recognizing the microclimate of each project is essential for sustainable design. Natural habitats experience extreme temperature shifts and strong winds, which must be considered when integrating healing gardens, courtyards, and naturally ventilated spaces.

Recognizing the microclimate of each project is essential for sustainable design. Natural habitats experience extreme temperature shifts and strong winds, which must be considered when integrating healing gardens, courtyards, and naturally ventilated spaces.

Integrated Sustainable Design Solutions.

SUSTAINABLE DESIGN SYSTEMS
Icons 3
Daylighting
Icons 3
Natural Ventilation
Icons 3
Photovoltaic
Icons 3
Fuel Cell
Icons 3
Thermal Energy Storage
Icons 3
Cogeneration
Icons 3
Well Water Cooling
Icons 3
Natural Cooling
Icons 3
Solar Heating & Air Conditioning
Icons 3
Micro Turbine Systems
Icons 3
Energy Management Systems
Icons 3
Metering & Utility Rate Analysis
Icons 3
Interruptible Power Programs
Icons 3
LED Lights
Icons 3
Low Wattage/High Efficiency Lamps
Icons 3
Energy Saving Ballasts
Icons 3
Automatic Timer Controls
Icons 3
Recycled Materials
image 21

What Clients Say About Budlong.

Hear from our clients about the impact of our expertise, innovation,
and dedication to excellence.

Your firm played a major role in the project successful completion which has led us to undertake other projects together… your firm has been a solid partner to our continued success.

You all have been most responsive and attentive to our client’s requirements; it truly makes them feel that they have the right team handling project.

Scott F. Gaudineer

A.I.A. President & CEO Flewelling & Moody Architects
Budlong have provided creative solutions and dedicated support during constructions on several MEP projects for LACCD through the last few years.

The professionalism of all Budlong engineers especially Shield Anderson has been a tremendous help in getting projects completed successfully. I would not have any hesitation in recommending Budlong for MEP engineering services to any entity public or private.

Safi Ishrati

Project Manager - LACCD, Owner’s Representative

We are excited in regard to our work with Budlong. I feel your team stepped up in a huge way to multiple site team comments and comments from out manufacturing team. The responsiveness overall has been incredible.

The Budlong team has stepped up the coordination efforts across all projects and has risen to the challenge of a lot of curve balls and aggressive timelines.

Shannon Hall

Project Manager, GIANT Modular, Design-Build Contractor

I have always found them to be responsive and attentive to our needs. I appreciate the fact that they provide HVAC, electrical, and low voltage design services which are coordinated internally.

John Tegtmeyer

AIA, Principal, Studio+
We work with Budlong on a on-going basis. They provide engineering services on many projects with various clients. They consistently provide excellent engineering service to us with deliverables submitted on-time and are well coordinated. We plan to continue to contract with Budlong.

Kevin O'Brien

Principal, LCDG
We have worked with Budlong on multiple public projects and continue
to pursue work with them based on our positive experience together.

Paul Murdoch

President, Paul Murdoch Architects

For past several years pleasure working with Budlong team on my projects with ease, promptness and subject matter expertise.

Patrick Kim

Facility Design Manager, HDR

Just wanted to say thanks again for all the hard work and dedication on our Lost Hills lab project! Now that we’ve been in there and able to set up our equipment, it’s been a pretty seamless transition. I thought we’d have some growing pains, but everything was well designed and accessible, it’s been real easy to pass the baton and start running.

Thanks for everything you did – if there’s ever an opportunity to support you all we would be happy to do it. You guys rock!

Jake M Hundley

Research Staff Member, HRL

Let’s Work Together and
Bring Your Vision To Life.