USC/NTT Generator Replacement Project

Budlong provided engineering services for USC Medical Facility to relocate the generator day tank, as requested by a new inspector. The original system was designed by a previous consultant, approved by OSHPD, but not closed out. Tasks included designing the day tank and piping relocation, vapor tank relocation, and keeping the existing underground fuel tank. Additionally, Budlong prepared OSHPD submittals and provided construction meetings and administration services.

Location:Los Angeles, California

Client:City of Inglewood

Value:$18M

Let’s Work Together and
Bring Your Vision To Life.