
St. Sofia Cathedral Church
Budlong undertook a comprehensive site visit of St. Sofia Cathedral Church, evaluating the existing HVAC system. The team observed a deteriorating split-type DX system, aging cooling tower, and pneumatic
control system. Proposing two replacement options, they suggested either a complete overhaul with new compressors, air handler units, cooling tower, and boiler, or the installation of a modern VRF system. Budlong’s scope of work included a feasibility study, outline specs, performance specifications,
and analysis of electrical capacity. In subsequent phases, the firm provided & conducted design-build coordination, and offered construction administration services, ensuring the successful upgrade of MEP systems for St. Sofia Cathedral.
Location: Los Angeles, California
Let’s Work Together and
Bring Your Vision To Life.