In this two-phase project, Phase I consisted of designing a new electrical system for replacement and upgrade in the park. It included sub-panels and distribution, a new additional service conversion to computer-controlled lighting and irrigation systems; provisions for telecommunications, alarms, and a fiber optic system, etc. Installation of a 800/1000 amp combination main entrance and distribution center with G.F.I. protection in the maintenance facility with branch circuits breakers to accommodate all services along with spares for the future. This phase included all new underground conduits, vaults, and transformers with circuits to supply power to each lighting loop at each field.