AMGEN
AMGEN
AMGEN

Amgen

B&A has worked on more than 50 MEP projects for Amgen. Some of those projects include:
  • Building 1: Lab Renovation Class II, B2 Bio-Safety Cabinet Installation.
  • Building 1 & 2: Hazardous Material Areas. Nitrogen Systems. Backfill projects
  • Building 3 & 4: Emergency Power Upgrade
  • Building 5: Lab Renovations, Cancer Research Lab, Freezer Farm, Oncology Lab
  • Building 6 & 7: ME&P Designs for Clean Room Manufacturing, Facilities, Gas & Storage Distribution, Tank Farm for LN2 and CO2.
  • Building 8: Lab Renovations
  • Building 14: Science Lab Renovations, Lab Tenant Improvements, First Floor Moves, Sample Bank Cell Sorter Laboratory.
  • Building 15: Bedding Dispensing System.
  • Building 18: Lab Renovations
  • Building 20: Reconfiguration of Air Lock.
  • Building 23: Process Piping Study
  • Building 25: Labs 2811 and 2815
  • Building 29: Hazardous Liquid Dispensing Rooms, Cell Mate, NMR Room.
  • Building 31: Powder Weigh Hood Installation.
  • Building 99: Strobic Fans Kilo Lab, Compressed Air System, New HVAC Humidifier, Long Range

Project Type:Industrial & Laboratories

Location:Thousand Oaks, CA

Let’s Work Together and
Bring Your Vision To Life.