Columbia-Space-Center

Columbia Space Center

Budlong provided uplighting on trees at the golf course and replaced with more energy efficient lighting that produces less heat and requires less maintenance.Our team also provided design, drawings, Title 24 calculations and compliance forms, specifications and budget cost estimates for the Columbia Space Center. Our team replaced the exisitng incandescent fixtures inside the meeting rooms and Mission Control, providing new flat panel LEDS. Provided full lighting controls for each of the spaces in the building. This also included a field survey and infrastructure investigation.

Project Type: Institutional

Location: Los Angeles, California

Year: 2020

Client City of Downey

Cost: $150M

Size: 20,000 sf

Let’s Work Together and
Bring Your Vision To Life.