
USC/NTT Generator Replacement
Budlong Projects
Budlong provided engineering services to USC Medical Facility. USC required to have the generator day tank relocated. The current generator and fuel system were designed by a previous consultant. The drawings were approved by OSHPD, installed and inspected. Nevertheless, the project had not been closed-out due to a new inspector requesting the day tank to be relocated.The tasks provided are listed as follows:
- • Design new day tank and piping relocation. Vapor tank relocation. Existing underground fuel tank to remain.
- • Prepared OSHPD submittals
- • Provided construction meetings and construction administration services.
Project Type: Healthcare
Location: Los Angeles, California
Client:USC
Cost$18M
Let’s Work Together and
Bring Your Vision To Life.