Projects

Sunniva Facility
Project TypeIndustrial & Labs
LocationLos Angeles, California
Year2010 - 2012
ClientLAWA
Cost$25M
Size58,000 sf

Project Details

Budlong provided a preliminary study and MEP Design for this 130,000 SF facility.

  • The existing plant (chillers and a cooling tower) was designed to provide 2,800 tons of cooling.
  • There was no permanent emergency power.
  • There was a boiler plant serving the needs of the full facility.

Our team located and coordinated with existing conditions approximately:

  • 4100 tons of cooling
  • 10 megawatts of emergency power.
  • Integrate a RO system currently in the design-build stage