The scope of work includes Mechanical, Plumbing, Electrical and Structural engineering for the renovation of approximately 14,525 square feet of the second floor of the Martin Luther King Jr./Drew Medical Center. This project is under constant change to upgrade the second floor to its most technological state. Code reviews, field surveys and analysis of existing as-built drawings, including structural integrity analysis were conducted and designs were developed to meet OSHPD codes. HVAC designing incorporates the calculations of cooling/heating loads, verification/ redesigns of the distribution.