Budlong provided full MEP, fire alarm, automatic fire sprinkler system, data and security design services for Jordan High School’s redevelopment. This was a design-build project and included the design of new and renovated buildings throughout the campus. The $65 million campus renovation included LEED and CHPS requirements and design was provided in REVIT.
The project enhanced chemical and pollutant source control and there is on-site renewable energy with a photovoltaic farm on roof top areas. Building electrical systems included power lighting, equipment, HVAC and controls.