
Anaheim Central Library
The library was built in 1963 and consists of three floors, two above ground and one below ground. Each floor is 22,176 square feet. Phase I, consisted of the first-floor renovation and expansion of the children’s area including the restroom, reconfiguration of ceiling grid, including lighting, redesign of the library entry and relocation of the adult computer lab from the 1st floor to the lower level. Phase I also included the replacement of an outdated chiller.
Project Type: Institutional
Location: Los Angeles, California
Year: 2011
Client City of Anaheim
Cost: $15M
Size: 22,176 sf
Let’s Work Together and
Bring Your Vision To Life.