USC/NTT Generator Replacement
Project TypeHealthcare
LocationLos Angeles, California
ClientUSC
Cost$18M

Project Details

Budlong provided engineering services to USC Medical Facility. USC required to have the generator day tank relocated. The current generator and fuel system were designed by a previous consultant. The drawings were approved by OSHPD, installed and inspected. Nevertheless, the project had not been closed-out due to a new inspector requesting the day tank to be relocated.

The tasks provided are listed as follows:
• Design new day tank and piping relocation. Vapor tank relocation. Existing underground fuel tank to remain.
• Prepared OSHPD submittals
• Provided construction meetings and construction administration services.