Budlong provided mechanical, electrical, plumbing, fire alarm, fire sprinkler, technology engineering design services to Slauson Connect Recreation and Community center to add much needed open space and increase the availability of recreational and childcare facilities in South Los Angeles. Moreover, there are varieties of recreation related programs, a childcare center, and a community meeting room.
It will also consist of a pedestrian bikeway and sidewalk, passive recreation elements, prefabricated restroom, a living wall fencing, and a demonstration area for sustainable features. The pathways and landscaping elements are a prescriptive component that has been identified in the Metro Rail to Rail Project. The extensive green roof shall include drought tolerant/ native planting, a community meeting space and a shade structure that incorporates photovoltaic panels.