Budlong provided mechanical, electrical and plumbing engineering design services required to develop construction documents. The school consisted of six single story buildings built in 1957 and a kindergarten building added in 1962. This project consisted of 13 classrooms and a library. The other buildings included a multi-purpose room with an auditorium, teacher’s lounge and cafeteria. The total enclosed and covered areas of the school include 26,540 square feet, and the site work included 188,730 square feet. It was closed by LAUSD in 1992 and the school was reopened to students in late 2008.