Projects

Thornton School of Music (TMC) Building
MEP Report
Project TypeHigher Education
LocationLos Angeles, California
Year2015
ClientUniversity of Southern California (USC)
Cost$3M
Size289,000 sf

Project Details

Budlong & Associates, Inc. (Budlong) provided the TMC Building with a return air and corridor assessment study in the basement area.

Budlong prepared a report with recommended upgrades and a ROM cost estimate to review with USC. We coordinated with an air balance contractor to work with Budlong to investigate the air distribution system and take airflow readings.

Budlong also provided fire protection upgrades that were required to bring them up to code.