CAMARILLO
DOWNTOWN, LOS ANGELES
GLENDALE

Industrial & Laboratories

B&A provides design services for high-tech cleanrooms, fume and bio hood upgrades, and research labs.

 


 

AMGEN

THOUSAND OAKS, CA

B&A has worked on more than 50 MEP projects for Amgen. Some of those projects include:

  • Building 1: Lab Renovation Class II, B2 Bio-Safety Cabinet Installation.
  • Building 1 & 2: Hazardous Material Areas. Nitrogen Systems. Backfill projects
  • Building 3 & 4: Emergency Power Upgrade
  • Building 5: Lab Renovations, Cancer  Research Lab, Freezer Farm, Oncology Lab
  • Building 6 & 7: ME&P Designs for Clean Room Manufacturing, Facilities, Gas & Storage Distribution, Tank Farm for LN2 and CO2.
  • Building 8: Lab Renovations
  • Building 14: Science Lab Renovations, Lab Tenant Improvements, First Floor Moves, Sample Bank Cell Sorter Laboratory.
  • Building 15: Bedding Dispensing System.
  • Building 18: Lab Renovations
  • Building 20: Reconfiguration of Air Lock.
  • Building 23: Process Piping Study
  • Building 25: Labs 2811 and 2815
  • Building 29: Hazardous Liquid Dispensing Rooms, Cell Mate, NMR Room.
  • Building 31: Powder Weigh Hood Installation.
  • Building 99: Strobic Fans Kilo Lab, Compressed Air System, New HVAC Humidifier, Long Range

Boeing North America

CANOGA PARK, CA

B&A provided full design services for the design of a 9,400 square foot Non-Destructive Engineering (NDE) test laboratory to replace an existing laboratory at the Santa Susana Field Laboratory. This laboratory utilized high-energy x-ray testing equipment; thus the design of the test cells was controlled by the radiation shielding requirements.

C3 JIAN

MARINA DEL REY, CA

B&A provided design services for the remodeling of C3 Jian’s existing facility. The scope of work included:

  • conversion of existing clean rooms into a clinical manufacturing suite designed to ISO 8 standards, and a QC laboratory
  • conversion of an existing clean storage area to a single utility room with a walk-in cooler